Sequence & timing

What happens before clearing starts

Everything expensive about clearing is decided before the machine arrives, not while it is running.

Clearing is irreversible. That single fact is why the preparation matters more here than in most trades — a wall built in the wrong place can be moved, and a tree cannot be put back.

Almost every dispute and every regret in this work traces back to something on this list not being settled beforehand. None of it is complicated and most of it is free.

The contractor will cover some of this at the walkthrough. The items that are the owner's responsibility are the ones that get missed.

The sequence

What happens, and in what order

Know where your boundaries are

If the pins are not set and findable, and you are clearing anywhere near a line, a survey comes first. Old fences are not reliable boundary markers — they wander. Clearing onto a neighbour's ground is a problem with no clean remedy.

Call 811 for utility locates

Free, required before ground-disturbing work, and it applies to clearing with any ground engagement rather than only to trenching. Allow the notice period and confirm the marks are visibly on the ground before work starts.

Flag what stays

Trees to keep, property pins, well heads, septic components and lids, drainage and tile outlets, and anything else that must survive. Do it physically with tape or paint, walking the site with the contractor. Verbal descriptions do not survive a running machine.

Agree the finished condition in writing

Are stumps coming out? To what depth? Does material stay on site? Is the ground rough-graded or as-cleared? This is the single most valuable paragraph in a clearing contract and the most commonly absent.

Sort out access and staging

Where the float unloads, where the machine travels, where material is stockpiled, and whether any of that crosses ground you care about — a lawn, a septic field, a drive that will rut.

Say what you know is buried

Old fence wire above all, but also dumped material, foundations, filled wells and abandoned equipment. This affects safety and price, and discovering it mid-job is worse for everyone.

The one paragraph that prevents most disputes

A written description of the condition the ground will be in when the contractor leaves. Not the work performed — the state of the site afterward.

It sounds like a formality and it is the difference between two trades meeting cleanly and an owner paying twice. A clearing quote that says 'mulch standing vegetation' and an excavation quote that assumes clean diggable ground do not meet in the middle by themselves.

Where this commonly goes wrong

  • Clearing before a survey on a parcel with unclear boundaries.
  • Skipping 811 because 'we are only clearing, not digging'.
  • Describing which trees to keep instead of flagging them.
  • Accepting a quote with no statement of finished condition.
  • Not mentioning known wire or buried debris.

Questions

Common questions on this

Do I really need a survey?

If your pins are set and findable, generally no. If they are not, and you are clearing near a boundary, yes — because clearing is irreversible and clearing across a line creates a liability that cannot be undone. Old fences are particularly unreliable as boundary markers; they wander over decades.

Is 811 needed for clearing, or only for digging?

For any work that disturbs the ground, and clearing frequently does — stump removal, root raking and grading all engage the soil. It is free, it takes a required notice period, and it is the cheapest risk reduction on the whole project.

What is the most important thing to get in writing?

What the ground will look like when they leave. Stumps in or out, to what depth, material staying or going, and whether anything is graded. That one paragraph is what makes the next trade's quote meaningful, and its absence is the most common cause of an owner paying twice for the same ground.